P5G · P7D
Total rehabilitation of the dental system with P5G and P7D
A 45-year-old man had a combined plan: cleaning and therapeutic preparation of teeth, P5G implants in the upper left and P7D implants in the lower molars, then metal-ceramic restorations on teeth and implants in both jaws. Implants were exposed at 3 months with a tuberosity connective-tissue graft on the upper side.
Timeline
Step by step
- Assessment, radiographs and rehabilitation plan
- P5G implants at 2.4, 2.6, 2.7; sutured under a cap
- P7D implants at 3.6, 3.7
- 3 monthsexposure of upper implants with CTG from the tuberosity (buccal and palatal); healing caps HWD / HW7D
- 3 monthsexposure of lower implants
- Open-tray impressions; metal-ceramic structures on S1PCD / S1PCHD abutments, lower then upper
- Smile and before/after
More cases
Similar cases

P5DP7D
Total rehabilitation of the dentition and jaw system
Full mouth – multiple segments, standard and single-stage (immediate) placement
View case →
P5DP7D
Immediate (2.5) and delayed (2.7) implants in one surgery
Premolar + molar – combined immediate and standard placement
View case →
P5GP1D
Navigated (fully guided) implantation in the upper jaw
Guided surgery – partial edentulism, upper jaw
View case →Request a quote / trial kit
Pricing, tailored to your practice.
Planning a similar case? Tell us about it and we'll send a private quote or a trial kit for the implants it needs.





















